Skip to main content
Phase 7 is in progress as of September 11, 2026. It is the daily-use and operational-qualification gate for the accepted Phase 4–6 system, not a source of new architecture or features. The qualification protocol requires three consecutive days of genuine, single-user teaching, fresh-session recall, correction, voice/text continuity, and document knowledge use. It records provenance quality, drift observations, resource/health evidence, recurring backup behavior, isolated recovery, and all defects. Scripted fixtures are useful regression checks but do not count as daily-use evidence. The detailed qualification plan is maintained in the private canonical project record; this page summarizes its public status. See the Learning Field Guide for the genuine-use exercises. The V0.1 stack remains configured, tested and accepted; no capability becomes OPERATIONAL until T17 passes with no required failure or unexplained pending item.