> ## Documentation Index
> Fetch the complete documentation index at: https://project-brain.rocheaiops.net/llms.txt
> Use this file to discover all available pages before exploring further.

# Phase acceptance criteria

> How approved, configured, tested, accepted, and operational claims differ.

**APPROVED** accepts scope. **CONFIGURED** means the target was actually configured. **TESTED** means recorded checks passed. **ACCEPTED** means the phase evidence was reviewed and accepted. **OPERATIONAL** requires live access, recovery, and sustained-use evidence appropriate to the capability.

Phase 4–6 are accepted/configured/tested; Phase 7 is in progress and remains the operational gate. Its technical prerequisites passed, but the required three-day genuine-use window is not complete. The private canonical test register defines the test IDs; [testing dossier](/validation/testing-dossier) provides a reader-facing key. [Current state](/getting-started/current-state) is the public status summary.
